Tenant improvement in existing 868,431sf 3-story addition for a data center., IB construction, B/ S-1/ S-2 Occupancy. First, second, and third floor build out and installation of electrical, mechanica
HOLDER CONSTRUCTION GROUP LLC · Phoenix
Est. start 2025
Equipment requirements
ExcavatorDozer
4 dealers tracking→Tenant improvement for existing (2) story 490,782 SF shell space data center, Group B/S-1/S-2 occupancy, Type I-B Construction. Modifications of existing 1st level warehouse into 3 data halls. Special
HOLDER CONSTRUCTION GROUP LLC · Phoenix
Est. start 2025
Equipment requirements
ExcavatorDozer
5 dealers tracking→AGUA FRIA FREEWAY (SR 101L) (SR 101 and I-10 System TI) — System Enhancement (Engineering)
FNF CONSTRUCTION, INC. · Phoenix
Est. start 2026
Equipment requirements
ExcavatorDozer
6 dealers tracking→Tenant improvement of a leased 77,243 SF area in existing 1,200,340SF, type II-B construction, B and S-1 occupancy warehouse. Modifications in lease area includes new 2,794 SF offices space with offic
MARCO CONTRACTORS, INC · Phoenix
Est. start 2025
Equipment requirements
ExcavatorDozer
7 dealers tracking→Commercial Trade Permit
TBD · Tucson
Est. start 2025
Equipment requirements
ExcavatorDozer
8 dealers tracking→BOB STUMP MEMORIAL PARKWAY (SR 303L) (51st Avenue - I-17) — Capacity Additions (Major Widening)
PULICE CONSTRUCTION, INC. · Phoenix
Est. start 2025
Equipment requirements
ExcavatorDozer
4 dealers tracking→Exterior work/modifications by separate permit. Permit for interior tenant improvement of existing 533,835 SF, type III-B construction shell building, S-1, B, A-3 and H-3 occupancy for package deliver
BIG D CONSTRUCTION · Phoenix
Est. start 2025
Equipment requirements
ExcavatorDozer
5 dealers tracking→Commercial Trade Permit
TBD · Tucson
Est. start 2025
Equipment requirements
ExcavatorDozer
6 dealers tracking→Phase 3 TI, North 2 interior data halls. The work will involve installation of interior walls, MEPs, generators, distribution switchgear, chillers, CRACs, and chiller piping. S-1 occupancy only 180108
Wespac Construction Inc · Phoenix
Est. start 2025
Equipment requirements
ExcavatorDozer
7 dealers tracking→Development of 229,416 SF, Type II-B construction, group B occupancy single story data center. The development building is designed with tilt wall construction and contains 94,951 square feet of data
RYAN COMPANIES · Phoenix
Est. start 2025
Equipment requirements
ExcavatorDozer
8 dealers tracking→NOGALES - TUCSON HIGHWAY (I-19) (I-19 Irvington TI) — TRAFFIC INTERCHANGE RE-CONSTRUCTION
AMES CONSTRUCTION, INC. · Tucson
Est. start 2026
Equipment requirements
ExcavatorDozer
4 dealers tracking→Install of new 250 MW / 1000 MWh Energy Storage System (ESS) on approx 8.795-acre site including substation area.' Utilize Tesla Megapack 2 XL outdoor rated energy storage system (ESS) enclosure, an o
MORTENSON DEVELOPMENT, INC. · Phoenix
Est. start 2025
Equipment requirements
ExcavatorDozer
5 dealers tracking→