FilmoreAI
Intelligence
TXNCFL
AustinDallas-Fort …HoustonCharlotteRaleigh-DurhamRoanoke
Dashboard

FilmoreAI · Equipment Lifecycle Intelligence

© 2026 FilmoreAI. All rights reserved.

Live · 5458 active projects · updated Updated weekly

RALEIGH-DURHAM

Live construction equipment intelligence

$36.5B
project pipeline
5,458
active projects
5,227
contractors
427
hot signals

Join 200+ reps · No credit card

01/THIS WEEK · DISPOSITION + MATURITY

Equipment moving in Raleigh-Durham.

Each row is a machine close to a decision: a lease maturing, or a unit running deep into its disposition window. Owner, phone, and the rebuild-vs-replace math unlock free.

Hot signals · Raleigh-Durham metro

Ten of this week's signals. Owner names unlock with a free account. The rest arrives in Monday's email.

10 of 75 this week
CAT 300.9D VPS & HPU300 Mini ExcavatorCAT300.9D VPS & HPU300 Mini Excavator·BRUCE ALLEN CONSTRUCTION COMPANY LLC· Raleigh DurhamLease matures Dec 2027 · 7 unitsHighway / Road ConstructionFleet 7 unitsRuns BOB + CAT + JDE + KOM + VOL142 UCC filingsHot
CAT 769D Off-Highway TruckCAT769D Off-Highway Truck·MARTIN MARIETTA MATERIALS INC· Raleigh DurhamLease matures Apr 2007 · 5 unitsCrushed, Broken GraniteFleet 21 unitsRuns CAS + CAT + JDE + KOM + VOL682 UCC filingsHot
CAT 289D Compact Track LoaderCAT289D Compact Track Loader·GIANT D••• I•••· Raleigh DurhamLease matures Feb 2022 · 4 unitsforestry, erosion, curbing, stormwater control, demolitionFleet 18 unitsRuns CAT + KBT + KOM + LBR + SDV + VMR + VOL + WRT306 UCC filingsHot
CAT 349F L XE (2017) ExcavatorCAT349F L XE (2017) Excavator·IRON H••• C••• L•••· Raleigh DurhamLease matures Jun 2024 · 2 unitsconcrete installation, road widening, stormwater basin construction, stormwater drainage, erosion device removalFleet 25 unitsRuns CAS + CAT + HIT + HYN + JDE + KBL + KOM + LBR + LNG + SAN229 UCC filingsHot
CAT 349F L XE (2017) ExcavatorCAT349F L XE (2017) Excavator·WYNN S••• D••• I•••· Raleigh DurhamLease matures May 2024 · 2 unitserosion control, grading, utilities, clearing, site developmentFleet 11 unitsRuns ATC + BMG + CAT + VOL + WRT222 UCC filingsHot
CAT D6K2 (Tier 4 Interim/Stage IIIB) Track DozerCATD6K2 (Tier 4 Interim/Stage IIIB) Track Dozer·IRON H••• C••• L•••· Raleigh DurhamLease matures Oct 2025 · 1 unitconcrete installation, road widening, stormwater basin construction, stormwater drainage, erosion device removalFleet 25 unitsRuns CAS + CAT + HIT + HYN + JDE + KBL + KOM + LBR + LNG + SAN229 UCC filingsHot
CAT 336 07CAT336 07·AXIS U••• I•••· Raleigh DurhamLease matures Feb 2025 · 2 unitsPU (Water Lines & Sewer Lines)Fleet 6 unitsRuns CAT32 UCC filingsHot
CAT C13 Power SystemCATC13 Power System·KRYOCAL L•••· Raleigh DurhamLease matures Feb 2026 · 1 unitFleet 5 unitsRuns CAT38 UCC filingsHot
JDE 5 inJDE5 in·JOHNNY D••• A••• J•••· Other NcDisposition signalHot
KBTJAMES A••• J•••· Other NcDisposition signalHot
+ 65 more this week, each with owner, phone, email

Work this week's 75 leads

Owner, phone, email, and the rebuild-vs-replace math, for every machine in a buying window right now.

Start free

New leads surface every Monday.

02/PROOF THE DATA IS REAL

Where the work is, and what's aging out.

The full project list and the 12-month equipment timeline are open. No gate. Contacts are the only thing we hold back.

Active projects · Raleigh-Durham
Bridge #608 and #042 RehabBridge

Starts Sep 2025 · $120K est. equipment

$2M
lowdermilkHighway

Starts Jul 2024 · $160K est. equipment

$2M
ToC Signal UpgradesHighway

Starts Dec 2025 · $160K est. equipment

$2M
NC 50 and Lake Wheeler RdHighway

Starts Jun 2025 · $160K est. equipment

$2M
Bridge Over US 1 (W. Pennsylvania Ave)Highway

Starts Apr 2025 · $160K est. equipment

$2M
Fishel Rd / NC 150 IntersectionHighway

Starts Jun 2025 · $160K est. equipment

$2M
Bridge 500070 Over The Neuse RiverBridge

Starts Mar 2025 · $120K est. equipment

$2M
US-401 AT SR-2044 (LIGON MILL RD)/SR-2224 (MITCHELL MILL RD) AND SR-2006 (PERRY CREEK RD).Highway

Starts Sep 2023 · $160K est. equipment

$2M

Full project list is public. Proof the data is real. Contacts gated.

Equipment timeline · last 12 months

Timeline data for this metro is loading soon.

Equipment timeline is live today. Open to everyone.

Free for dealer reps · 30-second signup

Raleigh-Durham's hottest 10 leads. Your inbox. Every Monday.

No new software. No login for your reps. Just the machines worth a call this week.

Try the product

Built for construction equipment dealers. Not a generic lead list.